CARNIVAL GRAND PORT – GRAND BAHAMA

Construsoftbimawards - CARNIVAL GRAND PORT – GRAND BAHAMA
Category Infrastructure Projects
Year 2024
Country Colombia
Organization SOLETANCHE BACHY COLOMBIA
Project partners ISLAND SITE DEVELOPMENT, SOLETANCHE BACHY INTERNATIONAL, SOLETANCHE BACHY COLOMBIA
Author SOLETANCHE BACHY COLOMBIA
Co-authors Luis Anderson Buitrago, Andrés Felipe Umbacia, Juan Pablo Peña
Client CARNIVAL CORPORATION & PLC
Place of construction BAHAMAS
Tags Parametric designPrefabConcreteTekla StructuresTrimble ConnectSteelSketchUp

Nuestro proyecto, el Muelle Grand Bahama, representa una ambiciosa ampliación diseñada para dar cabida a cruceros. Para nosotros, fue un desafío apasionante en términos de modelado y gestión documental dentro del marco de la metodología BIM. Desde el principio, nos enfrentamos a la tarea de crear modelos digitales precisos y detallados que capturaran cada aspecto del muelle, desde su infraestructura subacuática hasta su estructura superficial.
La base de la estructura del muelle se sustenta en pilotes, losas prefabricadas, vigas y defensas, todos meticulosamente diseñados para resistir las fuerzas del mar y proporcionar una base sólida para el atraque de embarcaciones de diversos tamaños. Más que simplemente una solución funcional y segura para las demandas del transporte marítimo, este proyecto se ha convertido en un punto focal de la zona.
Uno de nuestros principales desafíos fue la gestión de los Atributos Definidos por Usuario (ADU’s), que requirieron una planificación meticulosa y una coordinación eficiente entre los equipos de diseño y construcción. Implementamos un riguroso sistema de clasificación y etiquetado para garantizar la coherencia y la integridad de los datos en todo momento. Además, la gestión documental fue clave para el éxito del proyecto, desde la generación de planos y especificaciones hasta la coordinación de cambios y revisiones. Utilizamos herramientas BIM avanzadas para facilitar la colaboración y garantizar la precisión en la comunicación.

Our project, the Grand Bahama Pier, represents an ambitious expansion designed to accommodate cruise ships, and for us, it was an exciting challenge in terms of modeling and document management within the framework of the BIM methodology. From the outset, we faced the task of creating precise and detailed digital models that captured every aspect of the pier, from its underwater infrastructure to its surface structure.

The foundation of the pier structure is supported by piles, prefabricated slabs, beams, and fenders, all meticulously designed to withstand the forces of the sea and provide a solid base for docking vessels of various sizes. More than just a functional and secure solution for maritime transportation demands, this project has become a focal point of the area.

One of our main challenges was managing User Defined Attributes (ADUs), which required meticulous planning and efficient coordination among design and construction teams. We implemented a rigorous classification and labeling system to ensure consistency and integrity of data at all times. Additionally, document management was key to the project’s success, from generating plans and specifications to coordinating changes and revisions. We used advanced BIM tools to facilitate collaboration and ensure accuracy in communication.

The Grand Bahama Pier project stood out for the technical and management challenges associated with BIM modeling and efficient administration of User Defined Attributes, demonstrating our ability to tackle complex projects with innovation and professionalism, from design to execution.